Document Details
Title |
Hydrological Assessment: Site Plan Development | ||||||||||||||||||||||||||
Author |
DWB Forestry Services Ltd. | ||||||||||||||||||||||||||
Date |
2007 | ||||||||||||||||||||||||||
Abstract |
This project is to develop engineered site plans for the replacement of the high priority culvert crossings. Specific objectives of this project for each high priority crossing include: 1. Hydrological assessment to determine structure size and configuration to accomodate fish passage and Q100 flows. - Q100 flow calculations - General arrangement and configuration of the crossing structure 2. Crossing Site Plan and Crossing Layout - Site plan and design signed by a Professional Engineer - Deactiviation plans and prescriptions 3. Fisheries Consultation - DFO/MoE approvals of the Site Plans and designs - DFO/MoE approvals of any instream works related to the planning and implementation of the associated construction and/or deactivation works. DWB Forestry Services Limited. | ||||||||||||||||||||||||||
Report Number |
FIA2007MR017 | ||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||