Abstract
The prescriptions for road deactivation, landslide and gully rehabilitation aim to deactivate high risk non-status roads in order to lower the residual risk of the road networks to low residual risk. The project is located within a community watershed. Other values at risk include forest resources, recreational values, access to hydroelectric transmission lines, as well downstream railway and transportation corridors that can be affected by upstream hazards.