Abstract
The objective of the Vipond Road deactivation monitoring and maintenance project was: to ensure deactivation structures that were installed in 2005 are functioning as prescribed; and to protect investments on previously deactivated non-status roads on TFL. The project is not located in a community or domestic watershed. Frances Swan.