Document Details
Title |
Brake Check Ecosystem Restoration Project | ||||||
Author |
Forsite Consultants Ltd. | ||||||
Date |
2010 | ||||||
Abstract |
Works completed include thinning of the existing stand to 50 stems per hectare targeting the retention of Ponderosa pine and Douglas-fir trees over 30-cm DBH. All retained trees were pruned to a minimum height of 2.0 meters. All debris generated by project activites were burned on site. | ||||||
Report Number |
FIA2010MR170 | ||||||
|
|||||||