Document Details
![]() |
Title |
Project Completion Abstract For Culvert Replacement on Unnamed Tributary to Tchentlo Lake, Stuart River Watershed, Fort St James District, Northern Interior Forest Region | ||||||
Author |
British Columbia Timber Sales | ||||||
Date |
2009 | ||||||
Abstract |
The objective of this project was to replace the existing 3700mm x 2500mm closed metal pipe with an 18.288m steel girder/ timber deck bridge on columns located at ~ 3.2km on the Leo Keve (Leo Purvis) Forest Service Road. This work will ensure fish passage for all life stage present in the system. | ||||||
Report Number |
FIA2009MR069 | ||||||
|
|||||||