Document Details

Title
Esperon main Steel arch repair and Ireland Creek FSR post freshet inspections
Author
VanBuskirk, Calvin D.
Date
2009
Abstract
The 1000mm X 900mm existing wood box culvert over an outlet tributary of Long Lake was supported by wood cross-members placed on the channel bed. It was inspected and dtermined to be 232% undersized for Q100 flows, and a partial barrier to fish passage with a score of 43 on the Fish Passage Culvert Inspections (FPCIs) completed September 17, 2006 byDoug Whal RPBio of Snowy River Resources Ltd. This stream is an S3 containing Rainbow Trout and Long lake has resident rainbow trout. Provide a brief summary of the background and history that prompted development of the project.
Report Number
FIA2009MR128
 
Title
View
2008 Post Freshet Field Report
2008 Spring Freshet Field Assessment
2008 Spring Frehset Field Assessment
Project Completion Abstract
Statement of Construction Conformance
Design Approval