Document Details

Title
Pre-code culvert replacement
Author
DWB Forestry Services Ltd.
Date
2005
Abstract
Specific objectives of this project include: 1. Hydrological assessment to determine structure size and configuration to accommodate Q100 flows and fish passage guidelines; Q100 flow calculations; General arrangement and configuration of the crossing structure. 2. Road Layout and Design and Site Plan; Site plan and design signed by a professional engineer. 3. Fisheries Habitat Assessment and Consultation; DFO/MoE approvals of the road layout and site plan designs; DFO/MoE approvals of any instream works associated for the construction planning and implementation of the associated construction works. Prepared by: DWB Forestry Services Ltd.
Report Number
FIA2005MR178
 
Title
View
Proponent Action Plan
Culvert Installation Notes

EIRS Search Options

Useful Contacts