Report: Final Report Sinmax Creek Flow Recovery Plan: June 2005
Report Documents
|
|
|
Map Plotfiles
|
-
No files of this type available
|
|
Data Files
|
-
No files of this type available
|
|
Digital Map Files
|
-
No files of this type available
|
|
Image Document
|
-
No files of this type available
|
|
Video Files
|
-
No files of this type available
|
|
All Documents
|
|
Contact
|
-
If you have any questions on the information presented, or require additional report data or attachments, please contact the Report Contact
|
|
|
The intent of this project was to develop strategies to reduce the impact of inadequate
flow on fish habitat and to improve water management in Sinmax and Johnson Creeks.
|
Author: BC Rivers Consulting
|
|
|
Date Published: Jun 2005
|
Report ID: 23392
|
Audience: Government and Public
|
A severe drought in the summer of 2003 made it clear that water shortages could compromise the aquatic habitat in Sinmax Creek. A section of Sinmax Creek went dry for portions of August and October and all of September, resulting in a fish kill in the dewatered section. Spawning habitat for Kokanee and Sockeye was limited to the three kilometers downstream of the dewatered section. Problems with operation of the weir on Johnson Lake during that time negated any ability it may have had to improve the low flow situation during the most critical time. The intent of this project was to develop strategies to reduce the impact of inadequate flow on fish habitat and to improve water management in Sinmax and Johnson Creeks. The previous operating plan for the Johnson Lake weir was developed in 1996 and prescribed only average discharges from the lake, presumably during an average runoff year. In wet or average runoff years the flows are adequate to meet existing water needs. In extremely dry years the flows cannot meet all needs. One of the primary goals of this study is to provide greater direction regarding operating the weir during drier than average years. Since 1996 an additional 8 years of streamflow data has been gathered, including a wider variation of low flows. The lessons learned during these years are incorporated into this updated operating plan. Data collected and identified during this study improves understanding of the watershed and weir operations. Lessons learned can provide improved dam operation, but the reliability of the conclusions is limited by the poor quality of data collected in past years. A lack of recent flow measurements to confirm the validity of the rating curve at the outlet of Johnson Lake, which converts the gathered water level information to flow rates, is a significant constraint to the reliable interpretation of the this key streamflow data. Changes occurred in the channel, which affected the relationship between water level and flow, but the timing and sequence of the changes cannot be know with any certainty. Draft revisions to operating plan are appropriate, subject to continued monitoring. These revisions could improve the ability to maintain streamflow connectivity during severe droughts (such as 2003) without severe restrictions on water use. Previous studies have overestimated the water availability in the watershed. Updated estimates can provide a more realistic basis for weir operation and more realistic expectations for the goals that can be achieved. The primary objective in the short term should be refining the operation of the Johnson Lake weir to best meet the existing needs. Initial discussions with irrigators and Inmet Mining show promise for cooperatively improving water management, to retain more water instream through the driest sections, and should be pursued while operating under the proposed draft operating plan. The draft operating plan should be reviewed following a 5 year trial period. If necessary, other water conservation initiatives should be pursued at that time.
|
Report Type
Subject
|
Region - Thompson-Nicola |
|
Fish and Fish Habitat - Restoration |
|
Watershed Groups - 128 - South Thompson |
|
Water Information - Restoration |
|
|
|
|
|
Warranty Disclaimer
This information is provided as a public service by the Government of British Columbia, Box 9411, Victoria, British Columbia, Canada V8W 9V1.
This Web site and all of the information it contains are provided "as is" without warranty of any kind, whether express or implied. All implied warranties, including, without limitation, implied warranties of merchantability, fitness for a particular purpose, and non-infringement, are hereby expressly disclaimed.
Limitation of Liabilities
Under no circumstances will the Government of British Columbia be liable to any person or business entity for any direct, indirect, special, incidental, consequential, or other damages based on any use of this Web site or any other Web site to which this site is linked, including, without limitation, any lost profits, business interruption, or loss of programs or information, even if the Government of British Columbia has been specifically advised of the possibility of such damages.
|